Search Contact information
University of Cambridge Home Department of Engineering
University of Cambridge > Engineering Department > News & Features

CamBridge Bridge Design Competition

7 September 2009

The Department's Outreach Officer Dr Joy Warde recently ran two competitions to design bridges for the River Cam to mark the University's 800th anniversary celebrations. CamBridge Junior Competition (ages 5-11) and the CamBridge Senior Competition (ages 11-99).

The Junior Challenge (ages 5-11)

The junior challenge was to consider what the bridges of the future will look like and to design a foot and cycle bridge for the River Cam for 2109. There must be a clearance of 4m at the mid point of the bridge to allow boats to pass underneath.

Entries were judged according to their aesthetics, quality of drawing and technical plausibility.

The two winning designs will be included in the “Letters to the Future” which will be stored at the University Library until 2109. These letters will be opened during the 900th anniversary celebrations.

Winner 5-7 age range

The 'Rowing Boat' by James Pachebat, aged 7 from Stuntney, Ely.

Winner 8-11 age range

'The Three Punts Bridge' by Riccardo Nori, aged 8 from Bourn.

The 'Rowing Boat' by James Pachebat, aged 7
The 'Rowing Boat' bridge, side view by James Pachebat, aged 7.
Click on the image to see a larger version

The 'Rowing Boat' by James Pachebat, aged 7
The 'Rowing Boat' bridge, view from above by James Pachebat, aged 7.
Click on the image to see a larger version

'The Three Punts Bridge' by Riccardo Nori, aged 8
'The Three Punts Bridge', side view by Riccardo Nori, aged 8.
Click on the image to see a larger version

The 'Rowing Boat' by James Pachebat, aged 7
'The Three Punts Bridge', view from above by Riccardo Nori, aged 8.
Click on the image to see a larger version

The Senior Challenge (ages 11-99)

On Saturday 20 June local families and schools were invited to build a model bridge for the River Cam. The eager contestants designed, made and tested a model bridge.

Teams were 4-6 people. A list of acceptable building materials and competition rules were sent to all participants in advance of the competition. All teams were encouraged to plan their bridge design in advance of the competition as the construction time was very short. Teams could build and test their bridge at the Department or build their bridge at home and bring it to the Department for testing.

The bridges were judged on the basis of:

The winning teams

Most aesthetic design
Most aesthetic design
Click on the image to see a larger version

The maximum load carried by a paper/cardboard bridge was 75kg
The maximum load carried by a paper/cardboard bridge was 75kg
Click on the image to see a larger version

the most 'efficient' bridge was able to carry 77 times its own weight
The most 'efficient' bridge was able to carry 77 times its own weight
Click on the image to see a larger version

The results of all the teams in the Senior Bridge Building competition, with photos can be seen on the Outreach webpages.



800logo

 

© Department of Engineering at the University of Cambridge
Information provided by web-editor