Publications by Prof. S. EvansJump to: Article | Conference or Workshop Item Number of items: 33.
ArticleBastl, M and Johnson, M and Lightfoot, H and Evans, S (2012) Buyer-supplier relationships in a servitized environment: An examination with Cannon and Perreault's framework. International Journal of Operations and Production Management, 32. pp. 650-675. ISSN 0144-3577 Despeisse, M and Ball, PD and Evans, S and Levers, A (2012) Industrial ecology at factory level - A conceptual model. Journal of Cleaner Production, 31. pp. 30-39. ISSN 0959-6526 Evans, S and Martinez, V and Kingston, J and Bastl, M (2011) Challenges in transforming manufacturing organisations into product-service providers. Journal of Manufacturing Technology Management, 21. pp. 449-469. ISSN 1741-038X Charnley, F and Lemon, M and Evans, S (2011) Exploring the process of whole system design. Design Studies, 32. pp. 156-179. ISSN 0142-694X Lockett, H and Johnson, M and Evans, S and Bastl, M (2011) Product Service Systems and supply network relationships: An exploratory case study. Journal of Manufacturing Technology Management, 22. pp. 293-313. ISSN 1741-038X Evans, S and Rashid, S (2011) Sustainable Manufacturing Strategies in UK Manufacturing: literature versus real practices. Journal of Institute of Operations Management, 36. pp. 25-31. Vasantha, GVA and Hussain, R and Roy, R and Tiwari, A and Evans, S (2011) A framework for designing product service systems. ICED 11 - 18th International Conference on Engineering Design - Impacting Society Through Engineering Design, 4. pp. 67-76. Lettice, F and Wyatt, C and Evans, S (2010) Buyer-supplier partnerships during product design and development in the global automotive sector: Who invests, in what and when? International Journal of Production Economics, 127. pp. 309-319. ISSN 0925-5273 Tan, AR and Matzen, D and McAloone, TC and Evans, S (2010) Strategies for designing and developing services for manufacturing firms. CIRP Journal of Manufacturing Science and Technology, 3. pp. 90-97. ISSN 1755-5817 Bianchi, NP and Evans, S and Revetria, R and Tonelli, F (2009) Influencing factors of successful transitions towards product-service systems: A simulation approach. International Journal of Mathematics and Computers in Simulation, 3. pp. 30-43. ISSN 1998-0159 Ball, PD and Evans, S and Levers, A and Ellison, D (2009) Zero carbon manufacturing facility - Towards integrating material, energy, and waste process flows. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 223. pp. 1085-1096. ISSN 0954-4054 Rashid, SHA and Evans, S and Longhurst, P (2008) A comparison of four sustainable manufacturing strategies. International Journal of Sustainable Engineering, 1. pp. 214-229. ISSN 1939-7038 Baines, TS and Lightfoot, HW and Evans, S and Neely, A and Greenough, R and Peppard, J and Roy, R and Shehab, E and Braganza, A and Tiwari, A and Alcock, JR and Angus, JP and Bastl, M and Cousens, A and Irving, P and Johnson, M and Kingston, J and Lockett, H and Martinez, V and Michele, P and Tranfield, D and Walton, IM and Wilson, H (2007) State-of-the-art in product-service systems. P I MECH ENG B-J ENG, 221. pp. 1543-1552. ISSN 0954-4054 Baines, TS and Williams, GM and Lightfoot, H and Evans, S (2007) Beyond theory: An examination of lean new product introduction practices in the UK. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 221. pp. 1593-1600. ISSN 0954-4054 Partidário, PJ and Lambert, J and Evans, S (2007) Building more sustainable solutions in production-consumption systems: the case of food for people with reduced access. Journal of Cleaner Production, 15. pp. 513-524. ISSN 0959-6526 Evans, S and Partidário, PJ and Lambert, J (2007) Industrialization as a key element of sustainable product-service solutions. International Journal of Production Research, 45. pp. 4225-4246. ISSN 0020-7543 Law, B and Evans, S (2007) Understanding luxury in the premium automotive industry. Proceedings of the 2007 Conference on Designing Pleasurable Products and Interfaces, DPPI'07. pp. 168-179. Evans, S and Burns, AD (2007) An investigation of customer delight during product evaluation: Implications for the development of desirable products. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 221. pp. 1625-1640. ISSN 0954-4054 Dayan, R and Evans, S (2006) KM your way to CMMI. Journal of Knowledge Management, 10. pp. 69-80. ISSN 1367-3270 Duarte, GM and Sackett, P and Evans, S (2004) One style does not fit all. Manufacturing Engineer, 83. pp. 44-48. ISSN 0956-9944 Duarte, GM and Sackett, P and Evans, S (2004) Step by step: Breaking outsourcing down into manageable phases. Engineering Management, 14. pp. 28-30. ISSN 0960-7919 Evans, S and Burns, A and Guldbrandsen, M (2003) Solution oriented partnerships - A new business model for integrating global-production efficiencies with sustainability. Design and Manufacture for Sustainable Development 2003. pp. 169-180. Payne, KH and Deasley, PJ and Morris, AJ and Evans, S and Fielding, JP and Guenov, M and Syamsudin, H (2002) A distributed process for the aerospace industry. Journal of Engineering Design, 13. pp. 253-260. ISSN 0954-4828 Sherwin, C and Evans, S (2000) Ecodesign innovation: Is 'early' always 'best'? IEEE International Symposium on Electronics and the Environment. pp. 112-117. Simon, M and Poole, S and Sweatman, A and Evans, S and Bhamra, T and Mcaloone, T (2000) Environmental priorities in strategic product development. Business Strategy and the Environment, 9. pp. 367-377. ISSN 0964-4733 Evans, S and Jukes, S (2000) Improving co-development through process alignment. International Journal of Operations and Production Management, 20. pp. 979-988. ISSN 0144-3577 Bhamra, TA and Evans, S (1999) An ecodesign model based on industry experience. IEE Colloquium (Digest). pp. 37-40. ISSN 0963-3308 Lane, R and Evans, S (1995) Solving problems in production scheduling. Computer Integrated Manufacturing Systems, 8. pp. 117-124. ISSN 0951-5240 Lettice, F and Smart, P and Evans, S (1995) A workbook-based methodology for implementing concurrent engineering. International Journal of Industrial Ergonomics, 16. pp. 339-351. ISSN 0169-8141 Conference or Workshop ItemMalvido, C and Moultrie, J and Livesey, F and Pawar, K and Riedel, J and Beltagui, A and Macbryde, J and Martinez, V and Evans, S and Nixon, B and Demian, P (2008) Towards a National Design Scoreboard: A Model to Enable Comparison of Performance between Countries. In: UNSPECIFIED pp. 126-137.. Moultrie, J and Livesey, TF and Malvido C, and Pawar, K and Riedel, J and Beltagui, A and Macbryde, J and Martinez, V and Evans, S and Nixon, B and Demian, P Developing a national design scoreboard. In: Performance Measurement Association Conference, 14-4-2009 to 17-4-2009, Otago, New Zealand. (Unpublished) Evans, S and Ball, P and Despeisse, M and Greenough, R and Hope, S and Kerrigan, R and Levers, A and Lunt, P and Oates, M and Quincey, R and Shao, L and Waltniel, T and Wright, J Modelling energy flows across buildings, facilities and manufacturing operations. In: International Manufacturing conference, 30-8-2011 to 1-9-2011, Dublin City University. (Unpublished) Evans, S and Ball, P and Despeisse, M and Greenough, R and Hope, S and Kerrigan, R and Levers, A and Lunt, P and Oates, M and Quincey, R and Shao, L and Waltniel, T and Wheatley, R and Wright, J Modelling energy flows across buildings, facilities and manufacturing operations. In: International Manufacturing conference, 30-8-2011 to 1-9-2011, Dublin City University. (Unpublished) |
